ESD Control Program Periodic Verification

by Fred Tenzer and Gene Felder, Desco Industries, Inc.

Some practical advice for implementing
ESD control periodic checks
Want to accomplish something important? A familiar formula is write a plan, select the specifications, and then periodically test to verify that the plan is being implemented according to the test
results. This is basically the requirements of an ESD control program, per the ESD Association standard, ANSI/ESD S20.20. This important standard, entitled Development of an Electrostatic Discharge Control Program, covers the requirements necessary to design, establish, implement, and maintain an ESD control program to protect electrical or electronic parts, assemblies and equipment susceptible to ESD damage.
S20.20 is a process document, and provides ESD control plan guidance; one of its requirements is having a “compliance verification plan” as a component of the ESD control plan. Per S20.20, paragraph 6.1.3., Compliance Verification Plan:
“A Compliance Verification Plan shall be established to ensure the organization’s compliance with the requirements of the Plan. Formal audits or certifications shall be conducted in accordance with a Compliance Verification Plan that identifies the requirements to be verified, and the frequency at which those verifications must occur. Test equipment shall be selected to make measurements of appropriate properties of the technical requirements that are incorporated into the ESD program plan.”